Check Out Phase 1 Of This 100 Kilowatt Solar Installation At A Water Treatment Plant In MacArthur, California

by | Jun 9, 2024

Check out this a 100-kilowatt double array ground mount solar installation at a 55-acre water treatment plant in MacArthur, California. The system includes 104 panels and is grandfathered under the PG&E NEM2 Aggregation Program.

If you’re a homeowner or you own a business, please reach out for a FreeSolar Consultation with one of our Hufft Solar Professionals.

Thanks for watching!

Hufft Solar Supplies

$39.96

$39.96

$21.96

$322.96

$19.96

$9.96

Recommended by Hufft

Jeremy Hufft

CEO of Hufft Solar Inc.

Anderson, California, United States

Share This